As part of its consultation with utility providers, the Planning Authority may request that an Electrical Demand Load Breakdown is submitted for major new development. We can provide this service in less than a week.
The objective of the report is to enable the district network operator (in Malta Enemalta Corporation is responsible for both generation and distribution) to assess network capacity to supply the proposed development.
The Electrical Demand Load Breakdown report will typically contain the number of single and three phase meters required and the total kVA and Amp load for the development.